01
Deep urban excavation
570,000 m³ excavated to a depth of 25 m within diaphragm walls and eight levels of active anchors.
570,000 m³excavated material
02Denitsa demolition
Mechanised demolition, material separation, loading and full clearance of the site in Sofia.
8,400 m²building area
03Sales office, Sofia
A completed commercial office documented from the opening construction stage to the finished project.
320 m²project area
04Utility infrastructure
DN500 and DN250 polyethylene sewer systems, a DN220 ductile-iron water main and a trenchless crossing with a casing pipe.
DN500 · DN250 · DN220completed systems
11+years of field experience
570,000 m³major excavation delivered
−25.00 mexcavation depth reached
BGnationwide delivery