Preparation and opening-up
Phased removal of facade cladding and preparation of the primary structure.


Large-scale mechanised demolition and full site clearance in a dense urban environment.
As principal contractor, GRANDE 2012 managed the complete sequence — from preparation and phased dismantling to concrete demolition, material separation and final site clearance.

The existing building before works commenced

The cleared site following completion of demolition
The works were divided into defined technical stages so each material stream could be handled safely and the site handed over ready for the next construction phase.

Phased removal of facade cladding and preparation of the primary structure.
Controlled dismantling, separation and loading of approximately 2,000 tonnes of steel structures and scrap.
Mechanised demolition of 10,000 m³ of concrete structures and preparation for removal.
Final separation, loading and clearance of the platform for the following works.
A documentary selection from each phase — steel structure, concrete, heavy equipment and final clearance.






GRANDE 2012 handed over a cleared and prepared site following nine months of phased work in an active urban environment.