01 — 570KGRANDE / PROJECT FILM−25
Selected project570 000 m³
Earthworks · Infrastructure · Demolition

Ground.
Under control.

We take on the difficult part of construction — high volumes, complex ground and critical programmes.

Working throughout BulgariaGROUND. UNDER CONTROL.
Proven capacity

Scale is not promised. It is measured.

11+years of field experience
570,000 m³major excavation delivered
−25.00 mexcavation depth reached
Core expertise

The ground dictates the method. We control delivery.

We select equipment, production method and pace around the actual conditions — not the theoretical maximum.

All services
Selected work

The result remains after the machines leave.

Measured quantities, clear responsibility and delivery that allows the next construction package to start on programme.

FLEET / 01HEAVY
CAPACITY
Heavy equipment

Capacity for the full cycle.

From ripping and bulk excavation to narrow trenches, haulage and compaction — the right configuration for the job.

22 tCrawler excavators
D155Bulldozers
8–9 tCompact excavators
18 tRollers
Explore the fleet
GRANDE 2012

When ground, programme and responsibility leave no room for compromise — GRANDE takes control.

New project

A difficult job?
Let us assess it.

Send drawings, a bill of quantities or a short brief. We will propose the right method and equipment.

Start a conversation