DN500 sewer
Installation of polyethylene pipework within a prepared and shored trench, with control of levels and connections.


A combined portfolio of sewer and water-main works delivered within active urban environments.
This case study brings together completed utility works using different diameters and methods — from open-cut and shored trenches to trenchless crossings and full surface reinstatement.

Installation of the pipeline route within an open trench

Completed inspection chamber and preparation of the route

Asphalt reinstatement following completion of the underground works
The delivery method is selected around pipe diameter, ground conditions, the urban environment and the need to protect traffic and existing infrastructure.

Installation of polyethylene pipework within a prepared and shored trench, with control of levels and connections.
Delivery of compact sewer routes, inspection chambers and associated connections.
Installation of ductile-iron water main pipework, fittings and associated assets in an active urban setting.
Installation with a casing pipe from a shored working shaft, limiting intervention at surface level.
Selected views from excavation, shoring, installation, trenchless works and reinstatement of the urban environment.






GRANDE 2012 manages the complete delivery cycle for utility routes — organisation, earthworks, installation, backfilling and reinstatement of the affected areas.