Completed works / Utilities

Utility infrastructure.

A combined portfolio of sewer and water-main works delivered within active urban environments.

01DN500 · DN250 polyethylene
02DN220 ductile iron
03Trenchless technology
DN500 · DN250polyethylene sewer systems
DN220ductile-iron water main
Trenchlesscrossing with a casing pipe
Scope

Different systems. One delivery standard.

This case study brings together completed utility works using different diameters and methods — from open-cut and shored trenches to trenchless crossings and full surface reinstatement.

Installation of the pipeline route within an open trench
Route

Installation of the pipeline route within an open trench

Completed inspection chamber and preparation of the route
Chamber

Completed inspection chamber and preparation of the route

Asphalt reinstatement following completion of the underground works
Reinstatement

Asphalt reinstatement following completion of the underground works

Methods

The route defines the method.

The delivery method is selected around pipe diameter, ground conditions, the urban environment and the need to protect traffic and existing infrastructure.

Casing-pipe installation within a shored working shaft
01

DN500 sewer

Installation of polyethylene pipework within a prepared and shored trench, with control of levels and connections.

02

DN250 sewer

Delivery of compact sewer routes, inspection chambers and associated connections.

03

DN220 water main

Installation of ductile-iron water main pipework, fittings and associated assets in an active urban setting.

04

Trenchless crossing

Installation with a casing pipe from a shored working shaft, limiting intervention at surface level.

Outcome

From excavation to reinstated surface.

GRANDE 2012 manages the complete delivery cycle for utility routes — organisation, earthworks, installation, backfilling and reinstatement of the affected areas.